Northbay gas plant
Overview
Inspections and assets for this week. Friday 14 November 2026.
Recent inspections
Last 7 days and next 7 days
| Inspection | Date | Inspector | Status |
|---|
Live now
V-1042 external CUI check
Field technicianR. Karim
Remote inspectorA. Lindqvist
Elapsed00:18:42
Video latency48 ms
Assets
Select a row to see details
| Tag | Description | Last inspected | Condition |
|---|
Assets / V-1042
V-1042 HP separator
Thickness monitoring locations from the last UT survey, 8 October 2026. Select a tag on the model.
3D model
Horizontal vessel, 2000 mm ID, 5000 mm tangent to tangent
Drag to orbit, scroll to zoom, right drag to pan
Monitoring locations
Governing rate is the higher of long and short term
| CML | Last | Life | Status |
|---|
Inspections / Session 7741
V-1042 external CUI check
R. Karim, site camera
ALA. Lindqvist